A finished interlocking-paver driveway, landscaped borders and a white home behind wood entry gates.

SIDE YARDS AND CONNECTING WALKS

Buena Park pavers.

A bin can fit through the side gate and still get stuck on the turn. We lay paver walks, patios and driveways in Buena Park with a clear route from the backyard to the street.

Scope
Side-yard access
Services
Driveways, patios, walkways
Surfaces
Interlocking pavers and concrete
Inquiries
Free estimates

OCIP project footage. Location shown may differ from this service area.

Walk the side yard on bin day.

Wheel a full bin from its usual spot to the driveway. Where do you have to back up, lift a wheel or reach over it to unlatch the gate? That's the part of the side yard to measure first.

The useful width can change halfway down the house. A hose reel, projecting handle or gatepost may take up space that looks clear on a sketch. Show us the equipment and access panels along the wall so we can leave room to reach them.

Follow the water down the same route. If a downspout empties by the gate or a sprinkler leaves a strip of mud along the fence, point that out. We look at the paving level, the outlet and the route water can take before setting the path.

Join the back gate to the driveway.

Driveways

Make the turn from the side path onto the driveway with the bin in front of you. Mark where its wheels run off the paving so we can allow for that corner.

Patios

A patio can meet a working path at one edge. Leave a clear strip past the door and a place to park bikes once they reach the backyard.

Walkways

Plan a continuous walking and rolling surface through the gate. Gate swing, turns and equipment access help determine where the path can narrow and where it should open up.

Concrete

A concrete pad can provide a level place for the bins beside a paver walk. We'll look at how the wheels cross the joint and where rainwater goes.

Which way does the gate open?

Stand where you normally unlatch it with a bike beside you. An inward swing needs a clear landing inside the yard. An outward swing needs room on the approach. We can mark that arc on the plan before setting the new surface height.

What shares the side yard?

  • Count the bins and note where they sit between collection days.
  • Mark meters, access panels, hose bibs and irrigation controls you need to reach.
  • Photograph the low spot or the downspout while you can see where the water goes.

Map the route from end to end.

01

Start at storage

Show us where the bins or bikes live and walk the route with the widest item you regularly take through.

02

Measure the tight spots

Check the gate opening, corners and projections along the wall. Include room to open doors and operate latches.

03

Choose the surface

Compare pavers and concrete for the path and storage area. Review the finished levels and connections at both ends.

Questions about paving in Buena Park.

Start with the widest item you move through it, then allow space to steer with your hands on the handles. We'll measure the bends and gate opening as well as the straight stretch.

It may be possible if the gate clears the proposed surface through its full swing. We check the lower edge, latch position and both approaches before setting the paving level.

Show us which parts need to open and where someone stands to service them. We'll plan around that space and flag any clearance requirements to confirm with the utility.

We'll look at where the downspout discharges and where the water could go. The estimate can then distinguish paving work from any change to drainage.

Often the path can meet an existing patio edge. Its condition, height and the turn into the yard determine what preparation is needed at that joint.

The estimate is free. A view through the open gate and one looking back toward the driveway will help us understand the approach before visiting.

Show us the tightest turn.

A photo through the open gate gives us a starting point. Tell us what you need to move from one end of the yard to the other.

A finished interlocking-paver driveway, landscaped borders and a white home behind wood entry gates.

SIDE YARDS AND CONNECTING WALKS

Buena Park pavers.

A bin can fit through the side gate and still get stuck on the turn. We lay paver walks, patios and driveways in Buena Park with a clear route from the backyard to the street.

Scope
Side-yard access
Services
Driveways, patios, walkways
Surfaces
Interlocking pavers and concrete
Inquiries
Free estimates

OCIP project footage. Location shown may differ from this service area.

Walk the side yard on bin day.

Wheel a full bin from its usual spot to the driveway. Where do you have to back up, lift a wheel or reach over it to unlatch the gate? That's the part of the side yard to measure first.

The useful width can change halfway down the house. A hose reel, projecting handle or gatepost may take up space that looks clear on a sketch. Show us the equipment and access panels along the wall so we can leave room to reach them.

Follow the water down the same route. If a downspout empties by the gate or a sprinkler leaves a strip of mud along the fence, point that out. We look at the paving level, the outlet and the route water can take before setting the path.

Join the back gate to the driveway.

Driveways

Make the turn from the side path onto the driveway with the bin in front of you. Mark where its wheels run off the paving so we can allow for that corner.

Patios

A patio can meet a working path at one edge. Leave a clear strip past the door and a place to park bikes once they reach the backyard.

Walkways

Plan a continuous walking and rolling surface through the gate. Gate swing, turns and equipment access help determine where the path can narrow and where it should open up.

Concrete

A concrete pad can provide a level place for the bins beside a paver walk. We'll look at how the wheels cross the joint and where rainwater goes.

Which way does the gate open?

Stand where you normally unlatch it with a bike beside you. An inward swing needs a clear landing inside the yard. An outward swing needs room on the approach. We can mark that arc on the plan before setting the new surface height.

What shares the side yard?

  • Count the bins and note where they sit between collection days.
  • Mark meters, access panels, hose bibs and irrigation controls you need to reach.
  • Photograph the low spot or the downspout while you can see where the water goes.

Map the route from end to end.

01

Start at storage

Show us where the bins or bikes live and walk the route with the widest item you regularly take through.

02

Measure the tight spots

Check the gate opening, corners and projections along the wall. Include room to open doors and operate latches.

03

Choose the surface

Compare pavers and concrete for the path and storage area. Review the finished levels and connections at both ends.

Questions about paving in Buena Park.

Start with the widest item you move through it, then allow space to steer with your hands on the handles. We'll measure the bends and gate opening as well as the straight stretch.

It may be possible if the gate clears the proposed surface through its full swing. We check the lower edge, latch position and both approaches before setting the paving level.

Show us which parts need to open and where someone stands to service them. We'll plan around that space and flag any clearance requirements to confirm with the utility.

We'll look at where the downspout discharges and where the water could go. The estimate can then distinguish paving work from any change to drainage.

Often the path can meet an existing patio edge. Its condition, height and the turn into the yard determine what preparation is needed at that joint.

The estimate is free. A view through the open gate and one looking back toward the driveway will help us understand the approach before visiting.

Show us the tightest turn.

A photo through the open gate gives us a starting point. Tell us what you need to move from one end of the yard to the other.